Project Management Glossary
Plain-English definitions of the terms you will meet in projects, certifications and job interviews. Type to filter instantly.
A
- Acceptance criteria
- Conditions a deliverable must meet to be accepted by the customer or product owner.
- Activity
- A distinct, scheduled portion of work performed during a project.
- Activity on node (AON)
- A network diagramming method in which activities are boxes (nodes) and arrows show dependencies.
- Actual cost (AC)
- The realised cost of work performed during a given period. Used in earned value management.
- Agile
- An iterative approach that delivers work in small increments and adapts based on feedback.
- Agile Manifesto
- The 2001 statement of four values and twelve principles underpinning agile practices.
- Analogous estimating
- Estimating duration or cost using actual values from a similar past project.
- Assumption
- A factor considered true for planning purposes without proof. Assumptions should be logged and validated.
B
- Backlog
- An ordered list of work items waiting to be done.
- Backlog refinement
- The ongoing activity of adding detail, estimates and order to backlog items.
- Baseline
- The approved version of the scope, schedule or cost plan, used for comparison against actual performance.
- Benefits realisation
- Ensuring that the outcomes a project was funded to deliver are actually achieved after handover.
- Bottom-up estimating
- Estimating each work package individually and aggregating the totals.
- Budget at completion (BAC)
- The total approved budget for the work to be performed.
- Burndown chart
- A chart showing work remaining over time, typically within a sprint or release.
- Burnup chart
- A chart showing work completed over time against total scope, making scope changes visible.
- Business case
- A justification for a project showing expected benefits, costs, risks and options.
C
- Capacity
- The amount of work a team or resource can take on in a period.
- Change control
- A formal process for reviewing, approving or rejecting changes to the baselines.
- Change control board (CCB)
- A group responsible for reviewing and deciding on change requests.
- Change request
- A formal proposal to modify scope, schedule, cost or another baseline.
- Closing
- The process group that formally completes a project or phase.
- Communication plan
- A document describing who needs what information, when, how and from whom.
- Constraint
- A limiting factor such as a fixed deadline, budget cap or regulation.
- Contingency reserve
- Time or money set aside for identified risks (known unknowns).
- Cost performance index (CPI)
- EV ÷ AC. A measure of cost efficiency; above 1.0 means under budget.
- Cost variance (CV)
- EV − AC. Negative values indicate a cost overrun.
- Crashing
- Shortening the schedule by adding resources to critical path activities.
- Critical chain
- A scheduling method that accounts for resource constraints and uses aggregated buffers.
- Critical path
- The longest sequence of dependent activities, determining the shortest project duration.
- Critical path method (CPM)
- A technique for calculating early and late dates and float to find the critical path.
- Cumulative flow diagram (CFD)
- A stacked area chart showing the number of items in each workflow state over time.
- Cycle time
- The time an item takes from when work starts on it to when it is finished.
D
- DACI
- A decision-making framework: Driver, Approver, Contributors, Informed.
- Daily Scrum
- A 15-minute daily event for Scrum developers to inspect progress toward the Sprint Goal.
- Decomposition
- Breaking deliverables or work into smaller, more manageable parts.
- Definition of Done (DoD)
- A shared, formal description of the quality standard an increment must meet.
- Definition of Ready (DoR)
- Criteria a backlog item must meet before a team pulls it into work.
- Deliverable
- Any unique, verifiable product, result or capability produced to complete a project.
- Dependency
- A logical relationship between activities, such as finish-to-start.
- Duration
- The number of work periods needed to complete an activity, excluding holidays.
E
- Early finish (EF)
- The earliest date an activity can finish, from the forward pass.
- Early start (ES)
- The earliest date an activity can start, from the forward pass.
- Earned value (EV)
- The budgeted value of the work actually completed to date.
- Earned value management (EVM)
- A method integrating scope, schedule and cost to measure performance objectively.
- Effort
- The number of labour units (e.g. person-hours) needed to complete an activity.
- Epic
- A large body of work that can be broken down into smaller user stories.
- Escalation
- Raising an issue or risk to a higher authority when it exceeds the project's tolerance.
- Estimate at completion (EAC)
- The expected total cost of the project when complete.
- Estimate to complete (ETC)
- The expected cost to finish all remaining work.
- Executing
- The process group in which the planned work is carried out.
- Expected monetary value (EMV)
- Probability multiplied by impact in money terms; used to size contingency.
F
- Fast-tracking
- Compressing a schedule by performing activities in parallel that were planned in sequence.
- Feature
- A distinguishing capability of a product that delivers value to users.
- Finish-to-finish (FF)
- A dependency in which a successor cannot finish until a predecessor finishes.
- Finish-to-start (FS)
- The most common dependency: a successor cannot start until its predecessor finishes.
- Float
- The amount of time an activity can be delayed without delaying the project; also called slack.
- Focus factor
- The proportion of available time a team can spend on planned work after interruptions.
- Forward pass
- The calculation of early start and early finish dates through a network.
- Free float
- How long an activity can be delayed without delaying the early start of any successor.
- Functional organisation
- A structure where staff are grouped by specialty and the functional manager holds authority.
G
- Gantt chart
- A bar chart showing activities against a timeline, often with dependencies and milestones.
- Gate review
- A decision point at the end of a phase to continue, change or stop the project.
- Gold plating
- Adding features beyond what was requested; a form of uncontrolled scope.
- Governance
- The framework of authority, decision-making and oversight for a project or portfolio.
H
- Hybrid approach
- A combination of predictive and adaptive practices within one project.
I
- Impediment
- Anything that blocks or slows a team's progress.
- Increment
- A usable piece of the product delivered in an iteration.
- Initiating
- The process group that defines and authorises a new project or phase.
- Issue
- A current problem or condition that must be resolved; a risk that has occurred.
- Issue log
- A record of issues, owners, actions and resolution status.
- Iteration
- A fixed time-box in which a team delivers a usable increment.
K
- Kanban
- A method for managing flow by visualising work and limiting work in progress.
- Kanban board
- A visual board with columns representing workflow states and cards for work items.
- Kick-off meeting
- The meeting that launches a project and aligns the team and stakeholders.
- KPI
- Key performance indicator: a measurable value showing progress toward an objective.
L
- Lag
- A delay imposed between a predecessor and successor activity.
- Late finish (LF)
- The latest date an activity can finish without delaying the project.
- Late start (LS)
- The latest date an activity can start without delaying the project.
- Lead
- An acceleration that lets a successor start before its predecessor finishes.
- Lean
- An approach focused on maximising customer value while minimising waste.
- Lessons learned
- Knowledge gained during a project, captured to improve future work.
- Little's Law
- Average cycle time equals average work in progress divided by average throughput.
M
- Management reserve
- Budget held for unidentified risks (unknown unknowns), outside the cost baseline.
- Matrix organisation
- A structure in which staff report to both functional and project managers.
- Milestone
- A significant point or event in a project with zero duration.
- Minimum viable product (MVP)
- The simplest version of a product that allows learning from real users.
- Monitoring and controlling
- The process group that tracks, reviews and regulates progress and performance.
- Monte Carlo simulation
- A technique that runs many random scenarios to model schedule or cost uncertainty.
- MoSCoW
- A prioritisation method: Must have, Should have, Could have, Won't have this time.
N
- Net present value (NPV)
- The present value of future cash flows minus the investment; used in business cases.
- Network diagram
- A graphical representation of activities and their dependencies.
O
- Objective
- A measurable outcome the project is intended to achieve.
- OKR
- Objectives and Key Results: a goal-setting framework linking ambitious goals to measurable results.
- Opportunity
- A risk with a potential positive effect on objectives.
P
- Parametric estimating
- Estimating using a statistical relationship, such as cost per square metre.
- PDU
- Professional development unit: a measure of learning used to maintain PMI certifications.
- PERT
- Program Evaluation and Review Technique; uses three-point estimates (O + 4M + P) ÷ 6.
- Phase
- A collection of logically related activities ending in one or more deliverables.
- Planned value (PV)
- The authorised budget assigned to work scheduled to be done by a given date.
- Planning
- The process group that establishes scope, objectives and the course of action.
- Planning poker
- A consensus-based estimation technique using cards with relative size values.
- PMO
- Project management office: a function that standardises governance and supports project delivery.
- Portfolio
- A collection of projects and programmes managed together to achieve strategic objectives.
- Precedence diagramming method (PDM)
- A technique for building schedule networks using nodes and four dependency types.
- Predictive approach
- A plan-driven approach where scope, schedule and cost are defined early; often called Waterfall.
- Procurement
- Obtaining goods or services from outside the project team.
- Product Owner
- In Scrum, the person accountable for maximising product value and ordering the backlog.
- Programme
- A group of related projects managed in a coordinated way to obtain benefits.
- Progressive elaboration
- Iteratively adding detail to a plan as more information becomes available.
- Project
- A temporary endeavour undertaken to create a unique product, service or result.
- Project charter
- A document that formally authorises a project and names the project manager.
- Project management plan
- The document describing how the project will be executed, monitored and closed.
- Project manager
- The person assigned to lead the team responsible for achieving project objectives.
- Project sponsor
- The person or group that provides resources and support and is accountable for the business case.
Q
- Quality assurance
- Activities that give confidence that quality requirements will be met through good process.
- Quality control
- Inspecting deliverables to verify they meet requirements.
R
- RACI matrix
- A responsibility chart: Responsible, Accountable, Consulted, Informed.
- RAG status
- Red, Amber, Green rating used in status reports to show health at a glance.
- RAID log
- A combined log of Risks, Assumptions, Issues and Dependencies (or Decisions).
- Release
- A set of increments delivered to users together.
- Requirements traceability matrix
- A table linking requirements to their origins and the deliverables that satisfy them.
- Resource levelling
- Adjusting start and finish dates to balance resource demand with supply.
- Resource smoothing
- Adjusting activities within their float so resource requirements stay within limits without moving the end date.
- Retrospective
- A meeting where a team reflects on how it worked and agrees improvements.
- Risk
- An uncertain event or condition that, if it occurs, affects at least one objective.
- Risk appetite
- The degree of uncertainty an organisation is willing to accept for a reward.
- Risk owner
- The person responsible for monitoring a risk and implementing responses.
- Risk register
- A document recording identified risks, analysis, owners and responses.
- Roadmap
- A high-level timeline of planned outcomes, releases or milestones.
- Rolling-wave planning
- Planning near-term work in detail and later work at a higher level.
S
- S-curve
- A graph of cumulative cost or work over time, typically shaped like an S.
- Schedule performance index (SPI)
- EV ÷ PV. Above 1.0 means ahead of schedule.
- Schedule variance (SV)
- EV − PV. Negative values indicate the project is behind schedule.
- Scope
- The total of products, services and results to be provided by a project.
- Scope creep
- Uncontrolled expansion of scope without adjustments to time, cost and resources.
- Scope statement
- A description of the project scope, deliverables, assumptions and constraints.
- Scrum
- A lightweight agile framework using sprints, three accountabilities, five events and three artifacts.
- Scrum Master
- The person accountable for a Scrum team's effectiveness and for coaching Scrum practice.
- Scrumban
- A hybrid combining Scrum's cadence with Kanban's flow management and WIP limits.
- Slack
- Another term for float.
- SMART objectives
- Objectives that are Specific, Measurable, Achievable, Relevant and Time-bound.
- Sprint
- A fixed time-box of one month or less during which a Scrum team creates an increment.
- Sprint Goal
- The single objective for a sprint, giving the team focus and flexibility.
- Sprint Planning
- The Scrum event that starts a sprint by defining why, what and how.
- Sprint Review
- The Scrum event where the team presents results to stakeholders and adapts the backlog.
- Stakeholder
- An individual, group or organisation that may affect or be affected by a project.
- Stakeholder register
- A list of stakeholders with their roles, interests, influence and engagement strategy.
- Start-to-start (SS)
- A dependency in which a successor cannot start until a predecessor starts.
- Statement of work (SOW)
- A narrative description of products or services to be delivered, often for a contract.
- Status report
- A periodic summary of progress, risks, issues and decisions needed.
- Steering committee
- A senior group that provides direction and makes key decisions for a project.
- Story points
- A relative unit for estimating effort, complexity and uncertainty of backlog items.
- Swimlane
- A horizontal row on a board used to separate types or classes of work.
T
- Task
- A unit of work, usually smaller than an activity, assigned to one person.
- Three-point estimating
- Estimating using optimistic, most likely and pessimistic values.
- Throughput
- The number of work items completed per unit of time.
- Time-box
- A fixed, maximum period of time for an activity or event.
- To-complete performance index (TCPI)
- The cost efficiency needed on remaining work to meet a budget target.
- Total float
- How long an activity can be delayed without delaying the project finish (LS − ES).
- Triple constraint
- The interdependence of scope, time and cost; changing one affects the others.
U
- User story
- A short description of a feature from the user's perspective: As a…, I want…, so that….
V
- Variance at completion (VAC)
- BAC − EAC. The projected budget surplus or deficit at completion.
- Velocity
- The amount of work, usually in story points, a team completes per iteration.
W
- WBS dictionary
- A document detailing each WBS element's description, owner, criteria and estimates.
- WIP limit
- A cap on the number of items allowed in a workflow stage at one time.
- Work breakdown structure (WBS)
- A hierarchical decomposition of the total project scope into deliverables and work packages.
- Work in progress (WIP)
- Items that have been started but not finished.
- Work package
- The lowest level of a WBS, which can be estimated, scheduled and assigned.
- Workaround
- An unplanned response to a risk that has occurred and had no planned response.